Family Veterinary Clinic/

Finished rendition small file

Family Veterinary Clinic

Almost Finished

Family Veterinary Clinic’s new buildingĀ opening spring 2010

For twenty-seven years, Family Veterinary Clinic has been a familiar destination for you and your beloved pets. Our modest Cape Cod house welcomed you, in times of joy and sorrow, with a family atmosphere and a caring staff. Over the years our family has grown, and the time has come for a new beginning. We say goodbye with a touch of sadness, but look forward with joy and anticipation as our new home begins to rise. Much thought and planning went into the design, and we are sure that you and your family will feel even more at home. We have the same care and the same staff with a new home to serve you for the next twenty-seven years.

Family Veterinary Clinic/

FVC Ground Breaking

  • The oak gets lifted up.
  • Once the pine tree is up in the air . . .
  • This scotch pine needs to go to a new location.
  • Check out that hole.
  • First will be the Oak.
  • Digging a plug for the Red Oak.
  • Red-Oak-to-be-moved
  • And down it goes into the plug.
  • After a six week rain delay the footers have started
  • Construction entrance, the beginning
  • Next is the scotch pine.
  • . . . it's ready to roll!
  • The scotch pine comes to rest in its plug.
  • Eve Andrezejewski (16 years with FVC!) did the honors at our staff grounbdbreaking.
  • Cake for our groundbreaking, thanks to Frank Weskel.
  • Footers
  • Ready for roof
  • Reinforcing steel
  • Concrete pump
  • Block walls
  • Gravel shooter
  • Shooter in action
  • Ready to start framing
  • Floor trusses
  • Ready for walls
  • Roof trusses
  • Porch
  • Ready for porch roof
  • Walls
  • Concrete pump
  • Concrete pumping
  • Brian Monn-Monn Construction
  • Roof and windows are done
  • Ready for the utilities
  • Siding is almost finished
  • New front desk
  • Dog sitting area
  • Cat sitting area
  • Refreshment area
  • Ready for the porches
  • Knauf Ecobatt insulation
  • Drywall ready for paint
  • Resilient sound channel (sound proofing)
  • Looking into the refreshment area
  • Porches have started
  • Primer
  • Priming is finished
  • Floors are in
  • Hardwood floors
  • Porch deck
  • From reception into refreshment
  • Wet dental lift table
  • Sun tube in exam #4
  • Front desk
  • Hidden exam table in acupuncture room
  • Refreshment area
  • Heated recovery cages
  • It will not be long now!
  • Almost finished